Sandan Industrial City · Halban · Sultanate of Oman
sales@unichems.co+968 7600 9006

SOLUTION SELECTION GUIDE

Flooring & concrete

Factories, warehouses and service areas

Flooring & concrete
Illustrative application photograph

WHAT DEFINES THE SELECTION?

Substrate, service conditions and specification.

This guide organises selection requirements. It is not an approved application specification. Products, coat thicknesses and intervals must come from the project-specific system document.

Technical review sequence

01

Assess the concrete

Age, moisture, integrity, cracks and required loading.

02

Preparation & repairs

Define preparation and defect repairs before system application.

03

Coats & service

Review system thickness, texture, exposure and return-to-service timing.

Before approving a coating system

System build-up
Identify each layer’s product and component compatibility.
Film thicknesses
Per-coat and total thickness from the approved specification.
Intervals & conditions
Reference temperature, humidity, pot life and recoat windows.
Inspection & acceptance
Preparation, thickness and acceptance requirements in the project document.

Already have the system specification?

Calculate each product from its approved data, then combine estimates in your enquiry.

Quantity calculator

YOUR NEXT STEP

Let’s start with your specification.

Talk to our team
Request a quote